adilabad forest limestone mining land lease

Limestone Crushing & Sand Making Plant for Adilabad Forest Mining Lease

The Adilabad forest limestone mining lease demands an efficient crushing and sand-making solution to process raw limestone into high-quality aggregates and manufactured sand (M-Sand). A tailored production line typically includes:

Core Equipment Configuration:
1. Primary Jaw Crusher: PE-600×900 (Feed size: 500mm, Capacity: 50-160t/h)
2. Secondary Cone Crusher: HPT300 (Max feed: 185mm, Output: 70-400t/h)
3. Tertiary Impact Crusher: VSI6X1150 (Sand production: 100-350t/h)
4. Vibrating Screens: 3YK3070 (3 decks, Processing capacity: 80-700t/h)

Key Product Parameters

Equipment Power(kW) Output Size(mm) Moisture Tolerance
Jaw Crusher 75 60-140 <8%
Cone Crusher 220 5-40 <6%
VSI Crusher 400×2 0-5(M-Sand) <4%
Screening System 15×4</td

>3mm/<3mm separation

>95% efficiency

Project Case: Telangana Limestone Processing Plant

Location: Adilabad Forest Reserve
Capacity: 450TPH
Final Products:
– 10-20mm aggregate (35%)
– 5-10mm aggregate (25%)
– M-Sand (40%)
Special Feature: Dust suppression system reduces PM10 emissions by 92%.

FAQ Section

A:The total investment ranges $1.8-$2.5 million depending on automation level.

A:The complete line requires ~15 acres including stockpile areas