plans to build an electric gold trommel

Electric Gold Trommel and Sandstone Aggregate Processing Line

For mining operations seeking eco-friendly solutions, an electric gold trommel paired with a sandstone aggregate processing line offers efficient material separation and crushing capabilities. This setup minimizes diesel consumption while maintaining high throughput.

Core Equipment Overview

The system integrates:
1. Electric-powered trommel screen (15-30kW motor)
2. Jaw crusher (90-160mm feed size)
3. Cone crusher (secondary crushing)
4. Vibrating screen (3-4 deck configuration)

Equipment Model Capacity (t/h) Power (kW)
Trommel GT-200E 50-80 22
Jaw Crusher JC-1200 100-150 75
Cone Crusher CC-300 80-120 90
Vibrating Screen VS-2460 150-200 7.5×2

Production Line Configuration

Raw material → Electric trommel (pre-screening) → Jaw crusher (coarse crushing) → Cone crusher (fine crushing) → Multi-deck screening → Finished aggregates (5-40mm gradation)

FAQ Section

Q: What’s the advantage of electric trommel over diesel?
A: Lower operating costs (~40% reduction), reduced noise (<75dB), and zero exhaust emissions.

Q: Can this process wet material?
A: Yes, the trommel handles materials with up to 15% moisture content.

Q: What’s the lifespan of wear parts?
A: Trommel screens last 6-12 months; crusher jaws 3-6 months depending on abrasiveness.

Engineering Case Study: Nevada Gold Project

A 200tph operation replaced diesel equipment with this electric system, achieving:
– 35% lower energy costs
– 98% material recovery rate
– Production of ASTM-certified

Knowledge