The Andhra Pradesh (AP) region offers significant potential for quarry mining businesses due to its abundant granite, limestone, and basalt reserves. Establishing a modern crushing and sand-making production line can capitalize on the growing demand for high-quality aggregates in infrastructure projects.

A typical 200-250TPH hard rock crushing plant includes:
1. Primary Jaw Crusher (PE-750×1060)
– Feed opening: 750×1060mm
– Capacity: 110-250t/h
– Power: 110kW

2. Secondary Cone Crusher (HPT300)
– Max feed size: 230mm
– Capacity: 120-340t/h
– Power: 315kW
3. Tertiary Impact Crusher (VSI6X1263)
– Throughput: 150-350t/h
– Rotor speed: 1000-1800rpm
– Power: 315×2kW
Raw material → Vibrating feeder → Jaw crusher → Cone crusher → VSI sand maker → Vibrating screen → Sand washer → Finished products
| Model | Capacity(t/h) | Power(kW) | Max Feed(mm) |
|---|---|---|---|
| PE-600×900 | 50-160 | 55-75 | 500 |
| HST160 | 90-260 | 160 | 185 |
| VSI5X1145 | 120-360 | 220×2 | 50 |
Q1: What’s the minimum investment for a complete plant?
A: Approximately $800,000-$1.2M for a 200TPH configuration.
Q2: How to choose between stationary and mobile plants?
A: Mobile plants suit multiple sites but cost 30% more; stationary plants offer higher output stability.
Q3