A well-planned crusher quarry method statement ensures efficient aggregate production. The typical setup includes primary jaw crushers, secondary cone/impact crushers, vibrating screens, and sand-making machines. Key parameters:
| Equipment | Model Example | Capacity (t/h) | Power (kW) |
|---|---|---|---|
| Jaw Crusher | PE600×900 | 50-160 | 75 |
| Cone Crusher | HPT300 | 120-340 | 315 |
| VSI Sand Maker | VSI1140 | 200-380 | 440 |
| Vibrating Screen | 3YK3070 | 80-500 | 30 |

1. Primary crushing with jaw crusher (output size: ≤300mm)
2. Secondary crushing with cone crusher (output size: ≤40mm)
3. Screening via multi-layer vibrating screens
4. Tertiary shaping with VSI crusher for high-quality manufactured sand

Q: How to reduce dust in quarry crushing?
A: Implement water spray systems + enclosed conveyors + bag filters.
Q: Typical lifespan of wear parts?
A: Jaw plates: 3-6 months, Cone mantles: 4-8 months depending on abrasiveness.
– Configuration: PE900×1200 Jaw + HST315 Cone + 3 sets VSI1140
– Output: 450tph aggregates (20% 0-5mm sand, 50% 5-20mm, 30% 20-40mm)
– Solution features: Automated grading system reduced manpower by 40%.