Modern gold plant refinery equipment integrates crushing, grinding, and separation technologies to maximize mineral recovery. Paired with sandstone aggregate production lines, these systems optimize resource utilization while meeting construction material demands.

The typical configuration includes:
1. Primary Jaw Crusher (Capacity: 50-800t/h, Feed size: ≤1200mm)
2. Secondary Cone Crusher (Closed-side setting: 6-38mm)
3. Tertiary Impact Crusher for shaping (Output gradation: 0-5mm, 5-10mm, 10-20mm)
4. Vibrating Screens (Decks: 2-4 layers, Screening efficiency: ≥90%)
| Equipment | Model Example | Power(kW) | Throughput(t/h) |
|---|---|---|---|
| Jaw Crusher | PE600×900 | 75 | 50-160 |
| Cone Crusher | HPT300 | 315 | 150-430 |
| VSI Crusher | B9100SE | 400 | 300-600 |
| Screening Machine | 3YK3070 | 30×2 | 80-650 |

Q1: What’s the typical lifespan of wear parts?
A: Jaw plates last 3-6 months depending on material hardness; cone crusher mantles 8-12 months.
Q2: How to control final product shape?
A: Adjust VSI crusher rotor speed (45-70m/s) and cascade ratio for optimal cubicity.
A dual-purpose plant processing auriferous quartzite achieved:
– Gold recovery rate: 93.5%