how to calculate sand in m20 grade concrete

Sand Calculation in M20 Grade Concrete

For M20 grade concrete (1:1.5:3 mix ratio), sand content is calculated as follows:
– Total dry volume: 1.54 m³ per 1 m³ of concrete (accounting for voids).
– Sand proportion: 1.5 parts of the total mix (cement:sand:aggregate = 1:1.5:3).
– Calculation:
Sand volume = (1.5 / (1 + 1.5 + 3)) × 1.54 = 0.42 m³ per m³ of concrete.

Crushing and Sand-Making Equipment for Quality Aggregates

To produce high-quality sand for concrete, a well-designed crushing and sand-making line is essential. Key equipment includes:

1. Jaw Crusher – Primary crushing of raw stone (<600mm).
2. Cone Crusher – Secondary crushing for finer output (20–50mm).
3. Vertical Shaft Impact Crusher (VSI) – Sand shaping and grading (<4.75mm).

Equipment Parameters

Equipment Model Capacity (t/h) Power (kW)
Jaw Crusher PE600×900 50–120 75
Cone Crusher HPT200 90–250 160
VSI Crusher S8-1140 100–300 250×2

Screening and Washing Systems

A vibrating screen removes oversized particles, while a sand washer reduces clay content (<0.075mm) to meet ASTM C33 standards.

Sustainable Production Tips:

– Use multi-stage crushing to optimize particle shape.
– Add dust suppression systems for eco-friendly operation.

<h2FAQ:

Q:What’s the ideal fineness modulus(Mx)for M20 concrete sand?
A:Mx

Knowledge