Iron ore mining requires robust equipment for crushing, screening, and sand making to produce high-quality aggregates. Below is a streamlined production line solution:
1. Primary Jaw Crusher:
– Model: JC120
– Feed Size: ≤800mm
– Capacity: 150-300 TPH
– Power: 110-132kW
2. Secondary Cone Crusher:
– Model: CC200
– Max Feed: 250mm
– Output: 0-50mm (adjustable)
– Power: 160kW

3. Tertiary Impact Crusher (Sand Maker):
– Model: VSI-1000
– Throughput: 80-150 TPH
– Finished Sand: 0-5mm (95% passing rate)
Raw iron ore → Primary crushing (Jaw Crusher) → Secondary crushing (Cone Crusher) → Screening → Tertiary shaping (VSI Crusher) → Final aggregates (5-20mm, 0-5mm).
| Equipment | Model | Capacity (TPH) | Power (kW) |
|---|---|---|---|
| Jaw Crusher | JC120 | 150-300 | 110-132 |
| Cone Crusher | CC200 | 100-250 | 160 |
| VSI Crusher | VSI-1000 | 80-150 | 220 |
| Vibrating Screen | S5X1860 | -400 TPH |

– Q1:What’s the lifespan of wear parts?
A1:Manganese jaws last ~6 months; cone liners ~8 months under normal iron ore conditions.
–