Ghana’s mining sector demands efficient washing plants for processing raw materials like gold-bearing gravels, granite, and quartz. A well-designed crushing and sand-making production line integrates screening, washing, and water recycling to meet environmental standards while maximizing yield.

The typical setup includes:
1. Primary Jaw Crusher (PE-600×900) – Capacity: 50-160 t/h
2. Secondary Cone Crusher (HPT300) – Closed-side setting: 19-38mm
3. Tertiary Impact Crusher (VSI1140) – Sand production: 70-585 t/h
4. Vibrating Screen (3YK2460) – Screening efficiency: ≥90%
5. Wheel Sand Washer (XS2900) – Water consumption: 30-180t/h
| Equipment | Model | Power(kW) | Output(t/h) |
|---|---|---|---|
| Jaw Crusher | PE750×1060 | 110 | 110-320 |
| Sand Maker | VSI5X1145 | 440 | 260-520 |
| Screw Washer | LSX1120 | 15×2 | 100-350 |
| Trommel Screen | TGS1848D | 11+3.7+1.5 | – |
Q1: What’s the minimum water requirement for a 100tph plant?
A: Approximately 150m³/day with proper recycling systems.

Q2: Can this process lateritic iron ore?
A: Yes, but requires modified screen meshes (+20mm openings).
Q3: Typical lifespan of wear parts?
A: Hammers last